Our Wonderful Followers who come back again and again to read about us...

Tuesday, November 12, 2019

We are Floored By This Next Step


Sorry I didn't get a blog post written yesterday. I spent a delightful day with my dear friend Connie who came up to visit from Oshkosh. We spent the entire day talking and chattering, sharing our quilting projects, catching up on family situations, and having a wonderful lunch together.  Dangnabbit, I forgot to get any pics of us together!

After a day's hiatus from writing the blog, I am back to the catch up posts about the work we did in October on the she shed.

As I said in my last blog, we had reached a fork in the road and needed to stop for a minute and make some choices.  We've reached a point of decision making. Originally, a few blogs back, I talked about the wonderful load of 660 square feet of Douglas fir flooring that we had picked up to do this entire room. It was a great idea and the wood tongue and groove flooring was beautiful.


But then I started imagining all of the work ahead of us. Thinking of renting the air-powered nailing tool and doing all of the work to nail each floorboard into place. Then of course we would have to rent the big sander and buy piles of disks to sand everything smooth and prep it. Filling in knot holes and removing any blemishes. Then the next step of course would be cleaning up all of the sawdust and starting the staining process. Lots of hands and knees work. Then finally following up with coats of polyurethane. This could take weeks. I think, myself personally, I was hitting some kind of a brick wall.

I started to dread the thought of doing the wood floors. The rest of our entire home already has hardwood flooring. I love hardwood flooring, but I just think I had enough of the work involved in making this raw wood into a beautiful floor. When I had initially envisioned this addition room, I had thought about wide gray plank flooring, either a textured laminate or vinyl plank.

Although Steve had made a really good choice and a great bargain on buying this flooring, I thought this would be probably the fork in the road moment of deciding what to do next. We talked about alternative plans.  Steve thought I made some good points, so we should delve into alternative ideas before going any further.

We went and looked at grey plank flooring. Some of it appears blotchy from end-to-end on the four foot long strips, being lighter on one end and darker on the other. It made big sections of open floor appear leopard printed. I didn't care for that.

I did find a nice textured laminate flooring with much more even tones of gray coloring and not such contrasting streaks. Actually, these planks were even wider than the first stuff we looked at. This was much more to my liking, and a lot more of what I had initially envisioned for the room.

Steve really liked this too. 

So after talking it over and thinking about the steps involved in doing the Douglas fir floor, we both agreed to swap horses midstream.  Being flexible is important when working together.

We put the wood up for sale on the Facebook marketplace and immediately we had four or five people clamoring to buy it. We sold it for what we paid for it, and a woman gratefully drove here all the way from Rhinelander, Wisconsin to pick it up. We helped her load it up and away it went. She was happy and so were we.

~~~~~~~

But now we had to wait for a sale on the flooring that we had decided on.

In the meantime, we picked up the 4 by 8 sheets of subfloor that we needed to cover the entire room over the floor joists. Before laying each one into place, we put a bead of heavy construction adhesive on the top of each joist before screwing the subfloor into place. This will prevent any squeaks.




Steve added the floor vent and ductwork from the main part of the basement.  Now the room will have central air and heating!  This is the partial door entrance scuttle hole into the basement, and the closed off old stone stairs from the past blog.  This grey door will be covered over with some cabinet doors to disguise it to look like a built-in cabinet instead. 



It felt like we could do a barn dance in this room once all of the subfloor was in place. it was so huge! I was delirious in how much space that is she shed was going to allow.

Our son-in-law Waylen helped carry over a big wall cabinet unit to mount on the wall over the scuttle hole.  I will write more about that later in the next blog, but it appears in some of the pics now.

Next we working on making the new stairs.  We had been using the original old stairs which we put back into place each time we pulled them away from the wall to do work.  They were many many years old and worn and not of the right riser and tread lengths for the space needed.



Steve is really good at figuring stairs out, and cut the stringers correctly the first time, do I ever doubt him?  Nope. Not with these projects!   He made the stringers with super strong with 2x12 boards, placing three of them to span 44 inches. 



Then we bought long lengths of bull nosed stair treads and I gave them double coats of thick oil based grey porch paint.  


Once they were dry, Steve cut them down to lengths of the treads and mounted them into place. We would construct the railings later, after the flooring was finished.


~~~~~~~~

Now it was time to wait for the next sale.  Even the 11% rebate sale would net us about $100 savings on 380 sq ft of flooring.

3 days later the plank flooring I wanted went on sale!

Just check out that happy face, this is like the home stretch!!!


We loaded up our little trailer and got our bundles of flooring back home and unloaded them into the room to acclimate for a day.  That way we are not constructing under too damp or too dry conditions with flooring fresh out of the box from the store.


Now the fun begins. We figured out where we wanted to start and where the baseline should be. Four rows done and this was easy peasy!



This flooring was a lot of fun to put together. We had already used some of it in the small laundry room and half bath earlier in the summer, so we knew what we were doing.

This has very nice thick pieces of engineered laminate flooring, with attached pad underneath each piece. No need to lay out large rolls of conventional padding like vinyl plank floors require.

To install this product, just lay one plank up against the previous row at a 45 degree angle, drop it down into place and it snaps into place.  Then give it a tap tap with the hammer on one end to join it to the previous piece. Then the edges meet up perfectly and you are done! Next piece, please.



We did careful cuts around the two electrical floor outlets.  I made little templates and we cut the planks with little rectangle holes to line up.



Then as were got further along, closer to the other wall, where the heat register was going to come into the room from the central heat and air duct. We made a template and carefully cut around to make it line up.



We completed the entire 24 by 16 area quickly (except three final pieces in the far corner under the stairs a.k.a The Cubby Hole. When I was a kid, we had a Cubby Hole in our house that went under the stairs. It was great to hide in, but it was also tall enough to hang our coats and snowmobile suits in. Kind of made a curtain to hide behind and nobody could find us back there.


The Cubby Hole in this she shed will now be a perfect hiding spot for the grandkids or the dogs.



When we got most of the floor installed, Steve helped me carry in rest of the white rattan patio furniture that we had residing out on the front porch. It had taken quite a beating over the summer being left out in the elements.



The week before, I spiffed it all up with a fresh coat of paint and we anxiously were waiting for the time to bring it in and set it in the room. This is the furniture that I had on the front porch at our last house.

Over the last few months during construction, I could envision it being used in this room.

Back to the floor installation: It was actually fun and when we were done, we had an instant floor. Now we didn't have to spend any time sanding and staining and varnishing.

The room was looking amazing,
and I was giddy with excitement! 
(the dogs --- not so much) 


With this weather resistant plank flooring, we won't have to worry about wet boots in and out, or dogs in and out with wet paws. Compared to our original idea of the wood flooring. This will be more water resistant and durable in the long haul.

We will add ceramic tile to the 4 foot by 12 foot entryway this week. We picked up a great bargain of some gray / black speckled ceramic tile from the ReStore that will harmonize beautifully with this gray plank floor.  We paid about 30 cents a tile and I think it will be perfect.


On the day after the flooring was complete, Steve went to spend the day with his brother and dad up in Sister Bay. Do you think I was going to just sit here and twiddle my thumbs? Heck no!

I started carrying in my big rug weaving loom, one piece at a time. Bit by bit, I carried it all in and started assembling it----


I can assemble this loom in my sleep. I have done it so many times. I had the loom all together except for the heaviest back beam which requires two people to carry it in and set it into place. I would have to wait for Steve to get home to help me with that part.


WELCOME HOME LOOM,
 after being packed away for 6 months


Next I started carrying in the pieces for my 12 ft long quilting frame. Each roller, each pole, each base piece etc found its spot along the north wall of the she shed. Soon I had that all put together too.



It was so exciting to see the things come in and start taking their spots in the room. This is the longest wall meant for my quilting frame, with the articulating lamps overhead.  Perfect!



I could close my eyes and see us setting in front of the big windows as the sun is rising with our coffee, or in the lovely mid day sunshine, or in the waning evening hours.  We could sit here looking out over the big backyard and the trees and the sky and nature and birds as they flutter in and out of our yard.

Actually, right now as I am typing up this blog, I am sitting on the middle of the couch looking out at the very scene that I just talked about.

Last night we had some gray foxes stop by, and we regularly have deer visiting us. The birds are fluttering up and down to the bird feeders eating the suet block, sunflower seeds, and thistle seeds in the feeders. Squirrels hop around and we haven't seen any bunny rabbits yet, but they left little paw prints in the snow this morning. There is word that there's a big old bear rumbling around town. We haven't seen him yet but he did leave some claw marks in the tree next to one of my bird feeders. Part of the feeder was cracked off and the seeds were out of it. So I know he came to visit.

This is the stuff that dreams are made of, having this room slowly come to fruition. Bit by bit, step by step. I am thinking I need to pinch myself to realize that I am not dreaming.

Tomorrow's blog post will be about installing some cabinetry, hooking up the natural gas stove and working on the trim.


Saturday, November 9, 2019

Getting on the Level with the Floor

These blog posts are catching up with the work we did on our she shed in October. This one deals with what we had to do to change a cement garage and mudroom floor into a flat surface to be ready to install flooring!

Seeing as the space we are converting was a single stall garage and a mud room, it just had an average everyday old uneven cement floor. There were cracks here and there, and a big uneven divide up the middle where the two pieces of cement met when it was first poured years and years ago. Now it was up to us to get it all sealed in, leveled, and a subfloor built, ready to install new flooring on top.

The first thing we did was purchase a large 5 gallon bucket of SealBest elastomeric roofing paint. We know this stuff works really well on our RV roof. It's kind of a rubbery thick paint that dries to form a good moisture barrier on roofing, wood, metal and concrete.  We know at the Big Box Store, it runs $70 for the 5 gal bucket.  But at the ReStore, we found a full new unopened bucket for only $30. Score!

We had used this product before, so we knew what we were dealing with.

First, we totally cleaned the floor and swept it well making sure it was dry before we began. Steve sealed up all of the cracks around the edges where the footing met the cement slab with a special cement urethane caulk. He went through about six tubes, but it was well worth it.

Using a heavy nap roller on a long extension handle we rolled the first coat of elastomeric paint on the floor.


We set out two big fans
 to circulate the air 
and assist in its drying time overnight.


The next day, the first coat was thoroughly dry, so we could add a second layer. Wow, it was amazing to see how big the room appeared once the floor was all white and bright.

(the 4x12 space by the door will be ceramic tile later)

With the sunshine streaming it, the floor was dried up in a short time compared to the overnight first coat when it was humid and damp out.  Now we went around the entire edge of the footing at the walls and added a strip of rubberized wide sealant tape, normally used to seal around windows and doors when installing on new construction.  It was a way to cover the top of the footings before our wood floor joists met the edges.


THIS IS GETTING SOOOO EXCITING! 
(to me, anyhow)


The next step was to start building a framework of cross support joists over and around the original stairs that lead down to the basement. There is another full size entrance to our basement on the other side of our house.  So we really don't need these.  Besides, they are old rubble stone, crumbling and dangerous! By closing them off, we can run flooring directly over the top of it. Steve had recently acquired a very nice hammer drill that took care of drilling the holes and then screwing in the special cement tapcon screws into the cement foundation.

I have a pic of the first three boards around the edges of the stairs, but didn't get a shot of the four cross board joists he put over the open space.  Once that was done, he then covered the entire thing with a thick piece of sub floor to bring it up level to the rest of the floor.



Speaking of level, here is another new toy for Steve's assortment of tools. A lazer level! We had never owned one before.  We chose one that showed in bright green. Steve is colorblind and the red lights and sometimes the blue lights give him grief.  Green is a good color for his eyes.



This really came in handy 
to find the highest spot 
and the lowest spot 
of the uneven flooring.  

Finnegan thought he needed to get in on the ACT





Once we had established where our high spot was, we could start laying out 2x4's to create the grid of floor joists. Each joist needed to be cut lengthwise to fit along the line of the uneven cement, but the top edge of the board had to be level and even for the flooring.

In the old days, they would have scribed it  (or pour all new cement that was level!)   But with the lazer level, each board had to be carefully marked with a magic marker all along the laser line. That was my job. Crawling on my hands and knees I carefully marked each board with little lines, every foot or so, as to where we needed to cut it.





Once my little marks were connected together with a yardstick so we could draw the line the entire length of the board with a magic marker. We brought each board, one at a time, out to the garage to the table saw. These boards were all 12 feet long, so it was a long process.  While Steve carefully fed each board through the saw, intently cutting on the line, I was at the other end catching the two pieces and trying to help hold it even and not pinching as it fed through the saw.  That way there were no slipped boards or awkward cuts by having two people do this process.



It was a really tedious job, and we needed to do 16 boards for the north section and 16 more boards for the south section. One at a time.  Here is the first board going in after we cut it!  Notice the "Supervisor" on the job.  Binney didn't care for the noise of the hammer drill, so she hid out up in the bedroom.



When each floor joist was brought back into the space and carefully screwed down into the cement --- using the hammer drill and tap con screws. We had to measure everything as exactly and carefully as we could. By spacing the support joists at 12 inch on center, it would make an even sturdier floor than the traditional 16 inch on center of most flooring installations.  Less movement, less squeaks.


We did a lot of "knee work" and used foam gardening pads instead of the strap on knee pads. It seemed to work better for us.  We also used a lot of ibuprofen at night. 

This is an interesting nighttime shot showing the laser light just tipping the edge of each one of the boards and even the little tufts of wood shavings from around where each tapcon screw head as it went into the wood.   Half way done! Enough for one day. Time for bed.



The northern side of the garage cement was higher then the southern side. We had to be pretty creative with shims and studs to get everything to join up and meet and remain level. I numbered each joist board in consecutive order as well as each end of the board North and South so no boards got flipped or flopped or rotated in the wrong direction during installation.




We had to carefully allow access for the natural gas pipe to cross the room and come up in the area that we had decided to add a natural gas fireplace stove unit. We also had to accommodate electrical wiring for two different in-floor outlets. I wanted one underneath the couch and the other underneath my center sewing island. Much better than having extension cords stretched across to the walls ... and safer too.




We worked our way across the floor putting each board into place and soon we were able to move on to the next step by the next afternoon.



Now we cut layers of rigid Styrofoam on the table saw, again it was a two person process to help hold it steady as it ripped through the insulation.  A long time ago, I found Steve that old Craftsman table saw at a rummage sale, for a bargain price of $50 and I snapped it up.  I only had my car, but the guy at the rummage sale DELIVERED it for me!  Surprise Surprise when Steve got home. I added to his "tool collection"!



Each piece was then laid into the spaces
 between the joists
to add extra insulation to the floor.

(we creatively used the scraps too,
and utilized my quilting cutting skills to make them all fit)


Well, I think this is enough for one blog post.

NEXT we had to come to a fork in the road. We had to make a BIG decision on what way to go with the next step, and if you stay tuned to my next blog, you will read why.  Hmmmmmmm?


Friday, November 8, 2019

White and Bright! Painting My She Shed

These blog posts are catching up on the past two months of work on the She Shed.

Three days had passed for the fresh plaster to cure. Now it was time to get started with the painting!

On one of our little forays up to the ReStore in Marinette, we happened upon a big 5 gallon bucket of really nice all white Sherwin-Williams contractor grade paint. There was about four gallons left in the bucket. We got the entire bucket for $30, which about what it would cost for 1 gallon of good paint.


I looked up this particular brand and type of paint up online and it's $77 a gallon! That makes this bucket worth about $300.00!  I only wanted bright white, no other colors.  My goal is to re-create the feeling of the front porch at our last home in Chilton. 

Our old front porch - 
Light Bright and Airy. 


I eagerly got out my paint roller, extended telescoping handle, and my favorite paint tray. I like this tray because I can take a break, and snap the lid on with the roller in place, and it keeps the paint fresh without skinning over or drying out.



We started with a coat of primer that soaked right in. It was almost dry on the first wall by the time I finished the last wall.

Steve does not enjoy painting, to say the least. But he did go around on the ladder and do the cutting in for me ahead of my rolling. He takes a wide brush and makes sure he gets into every corner and then about the first four to five inches down each wall and across each ceiling surface.



Because we don't have trim up yet, we can run the paint right up to the edges of the plaster around the windows. The trim will come later.


I put on my MP3 player of soft Celtic music and set myself to work... I do enjoy painting. A lot. And now that the new paints don't have strong fumes like they used to, this one is especially nice because it is no VOC. It doesn't bother my lungs and I can paint away till my heart's content.


The room transformed itself from the raw plaster over to a beautiful white solid surface with primer and two coats of paint.  We will wrap the beam and cover the entryway ceiling later with tongue and groove cardsiding.



It gave us a really good feeling to see the room become more and more finished with each stroke of the roller.  At the very end of the second coat on the ceiling, we had to run and buy one more single gallon of that paint! The guy at the Sherwin Williams store said the retail price was $79 for the single gallon. ACK! Since I had the matching contractor bucket, he dropped it down to the contractor price. $37.00!  That was more than the entire big bucket I had gotten from the ReStore, but I needed that last gallon to finish the job.  Oh well. 

Here I am doing the very last section of the ceiling.



Once the paint was dry, we could start attaching all of the light fixtures and putting on the covers to the switches and wall outlets.

This was really exciting, because now we could see how our light fixtures were going to look. I had mentioned in a couple blogs back about finding these wall sconces at the local hardware store on clearance. They were in three different finishes, one was black, one was rubbed oil bronze, and one was silver. I had spray-painted them all white. Then I had found a lady on Facebook marketplace selling matching stained glass lamp shades that match the rest of the fixtures in my house.


We put them up as Steve connected all of the wires, and then I to had to decide if we wanted the lights to aim up or aim down??


Two sconces are on each side of the french windows facing east, and a third one near the entrance from the big garage.  Here I tried aiming them up. (Finnegan on guard dog duty now that the windows in the doors are low enough for him to see out of).



I finally I put pictures of both ways on my Facebook page and asked my friends to help me vote. The majority voted "down" so the majority rules. But we can change them at any time if we want, because there's only one central nut holding the fixture on to the wall.



Steve had figured out a way of how to mount my two articulating arm lights over the working area for my 12 foot quilting frame. He adapted them so they could be wired directly and mounted tight to the wall. I can swing them out or in any direction to use them but push them back out of the way when not in use.



We added LED flood lights to brightly illuminate the area.



Next thing, Steve mounted the ceiling fan up high on the sloped 11 foot tall ceiling. It's a commercial version of a fan, and goes very fast with speeds of one to five. A number five feels like you are standing underneath a helicopter! But it's very whisper-quiet down on setting one or two which is where we will keep it. Even on speed one it moves the air quite extensively around the room.



It was a really good bargain on sale for only $45. I like it because it's white and simple and plain and doesn't draw a lot of attention to it up there on the ceiling. I think big clunky ceiling fans with dark blades bother my eyes and give me a vertigo feeling. So this one will do the trick.

With all of the light fixtures in place and operational, we can dim down the wall sconces or brighten them up as we wish. Steve has 3 switches to operate all three at one time. He placed them by the entry door, the kitchen door and in the middle of the south wall in the room.

He also got all of the wiring for the exterior lights and exterior outlet functioning as well.

Steve got the TV mounted up on the bracket and hooked up to the antenna and power line, as well as adding his soundbar. We took the bigger TV from the living room to keep as our main TV down here. We shuffled some other smaller TVs around to take it's place in the living room.

Steve figures he will be spending more time down here in the she shed than up in our living room. I think he is right. Haha!

He got the TV done just in time for the Packer game that afternoon. He set up his lawn chair in front of it and made himself at home. A beer, a bowl of chips and some salsa. He was all set.



Granddaughter Claire decided to try it out
 and watch some cartoons 
from the comfort on top of 
Grandma in the lawn chair! 



I think my next blog will be about the process in which we leveled the cement floor and added the grey plank flooring.

Stay tuned!